Public Library of Science
Browse
Fig_1.tif (1.06 MB)

10-fold cross validation scheme.

Download (0 kB)
figure
posted on 2016-01-05, 14:53 authored by Pierpaolo Palumbo, Luca Palmerini, Stefania Bandinelli, Lorenzo Chiari

Illustrative scheme of the 10-fold cross validation procedure. During the 10 iterations each sample receives a probabilistic prediction. All these predictions are then used to assess the Lasso model.

History