Figure_19.tif (2.2 MB)
Spatial and temporal view of the load in the Portland region between the time interval 1:00PM–1:30PM for the base case and evacuation case Evac I-a.
figure
posted on 2012-10-31, 00:40 authored by Chris Barrett, Karthik Channakeshava, Fei Huang, Junwhan Kim, Achla Marathe, Madhav V. Marathe, Guanhong Pei, Sudip Saha, Balaaji S. P. Subbiah, Anil Kumar S. VullikantiThe numbers are represented in scale. A: Load in Portland during a normal day with activities and calling patterns corresponding to base case; B: Load in Portland during an evacuation case Evac I-a.